Your GPU, your project Crypto payment without KYCHow to pay
English
My Account
First project guide

Choosing your first GPU: software first, memory second.

To build a shortlist of GPUs, start with your software, the memory you need and a spending cap. Rule out incompatible offerings; keep as "to be confirmed" any mandatory criterion with no evidence. Then break ties between candidates by their price for the same quantity and a duration that covers the work and recovery. At BriefGPU, fifteen models are offered for 3, 7 or 30 days; their capacity alone cannot predict your result.

On this page

Rule out incompatibilities before breaking ties between offerings

For a useful recommendation, separate the requirements that must be met from the preferences that help you choose. An essential extension that is incompatible eliminates an offering; a lower price does not make up for this flaw. Conversely, more memory is only a useful preference if it meets an identified need.

Keep a short record for each candidate: criterion, source consulted and decision. A missing feature remains to be confirmed before committing the expense if it determines your project. The name of a GPU or a build does not replace this check.

Rule out incompatibilities before breaking ties between offerings
Mandatory criterionSource to checkConsequence for selection
Software and extensionsVersion documentation, compute engine and dependencies.Known incompatibility: rule out. Required version not confirmed: keep pending.
Memory per GPUCapacity from the spec sheet and requirement measured on a representative workload.Keep only if the workload fits with acceptable settings; requirement unknown: prepare a limited trial.
Schedule and recoverySchedule including setup, feedback, reruns and final copy.Rule out a package that is too short; a required availability date remains to be confirmed.
Spending capPrice for the same number of lots over the same duration, plus estimated external expenses.Package above the cap: rule out. Unknown fees: total cost still undetermined.
Resources and accessRAM, storage, transfer and software needs compared against the information provided.If an essential value is missing, ask for confirmation; GPU memory does not replace it.
Account and paymentAccount process, terms and payment method.Check that the required account and crypto payment suit your use.

Two candidates to consider with a 30 USD plan budget

Let's take a hypothetical: a first trial on a GPU, a full 3-day window, and a 30 USD cap for the plan alone. After checking the software, here are two illustrative candidates from the BriefGPU catalog; they are neither an exhaustive list nor a speed ranking.

  • RTX A5000: 23.57 USD for 1 lot, 1 GPU with 24 GB nominal and 3 days. A candidate if your workload fits within that capacity at acceptable settings.
  • A40: 29.14 USD for 1 lot, 1 GPU with 48 GB nominal and 3 days. A candidate if the memory requirement justifies that capacity and the software stack supports it.

Pick an option, or restate the requirement

If both cards meet the requirements, compare the price and the benefits useful to the project; don't assume the A40 will produce results faster. If neither fits, don't recommend one just because it fits the budget. A 30 USD cap for the whole project also means evaluating licenses, storage, transfers, wallet or network fees, and any applicable charges or taxes.

To look for an alternative to your current hardware or service, keep the software, extensions, files, and expected quality as points of comparison. Specify what needs to change: insufficient memory, cost, timeline, or access constraints. A competing reference alone doesn't establish equivalence. For a few isolated hours, also consider whether the 3-day minimum suits you; the budget guide covers one-off rental and purchase.

BriefGPU payment is offered without a KYC procedure, but it isn't anonymous: the account requires first name, last name, email, and password. "I paid" flags the transfer without automatically confirming payment. If these conditions don't work for you, the offer doesn't pass your selection, even if the card meets the technical requirement.

Gather the information that changes the choice

Describe the result you want to deliver: an accepted folder of images, an exported scene, or an evaluated set of answers. Set the output format and the success criterion before comparing models. That way you'll distinguish a quality constraint, a memory shortfall, and an installation problem.

Note the exact version of your software, the extensions, the model if any, and the compute engine in use. An application advertised as GPU-compatible may depend on a more restrictive component. In PyTorch, the installation instructions distinguish CUDA and ROCm depending on the platform; the AMD matrix details the supported combinations. Check these prerequisites for your own workflow.

  • The software, its version, and its required extensions.
  • A sample containing ordinary files and difficult cases.
  • The settings you're considering: dimensions, batch sizes, input length, or precision depending on the tool.
  • An expected output, someone to check it, and a place to save it.

Compare memory with the same duration and quantity

The table uses three offers as capacity benchmarks. Each price covers a lot of one GPU for 3 days; the plans come from BriefGPU rates. The memory values are the models' nominal capacities, expressed in GB per card. GB here refers to nominal manufacturer GB, with no conversion to GiB. They describe neither the free memory during a run nor the server's RAM and storage.

These three offers are not a speed ranking. Consider 24 GB if your software and workload fit within it, 48 GB when memory limits the same work, then 80 GB for a requirement that goes beyond that tier. Large memory doesn't fix an incompatible extension or poorly prepared files.

Compare memory with the same duration and quantity
Example offerNominal memory per GPUGPUs per batchPrice for 1 lot and 3 daysQuestion to settle before choosing
NVIDIA RTX A500024 GB1$23.57Do the project and its settings fit within this capacity?
NVIDIA A4048 GB1$29.14Does the same project exceed 24 GB despite suitable settings?
NVIDIA A100 SXM80 GB1120 USDDoes the need exceed 48 GB on compatible software?

Don't mix up GPU memory, files, and number of cards

GPU memory holds the elements the GPU uses during computation. Storage keeps your files, and system memory runs the application. So the size of a folder on disk doesn't directly tell you how much GPU memory you need. Keep these three needs separate in your notes.

Multiple cards don't automatically pool their memory for a program designed for a single GPU. The application has to organize how the work is split and how data is exchanged. In the B200 offer, one lot contains two 180 GB GPUs: that doesn't make it a single 360 GB card. For a first task on a GPU, choose the per-card capacity before adding lots.

Prepare a trial run that goes all the way to the retrieved file

Once the environment is available, start with a simple example from your tool. Check the recognized device and how the application uses it. With PyTorch, the model and data must be placed on the appropriate compute device. A program that finishes without errors hasn't necessarily done the expected work on the GPU.

Then load your representative sample, keep the settings, and produce a small output. Open it in the destination tool, then retrieve a copy. This walkthrough also reveals format, dependency, or transfer issues. The configurator's Ubuntu, PyTorch, Blender, or custom preference expresses the preparation you're asking for; it doesn't prove that a specific version is already installed and tested.

Identify the failure before switching GPUs

Keep the message shown, the input involved, and the settings of the run that fails. Change one thing at a time. The leads in the table are there to organize your diagnosis; they don't replace the guidance specific to the software.

Identify the failure before switching GPUs
What you observeFirst useful checkWhat would justify comparing another card
The software won't start or doesn't recognize the GPU.Versions, compute engine, and supported extensions.The model isn't supported by the required pipeline.
A batch fails due to lack of memory.Batch size, largest input, and other loaded tasks.The need still exceeds capacity with acceptable settings.
The computation finishes, but the output isn't right.Settings, data, model used, and quality criteria.A comparable trial shows a useful benefit; memory alone isn't enough to conclude it.
The project takes longer than expected.Preparation, processing, review, and retrieval time tracked separately.The computation itself is the bottleneck and a like-for-like comparison delivers a measured improvement.

Example approach: preparing a first batch of visuals

Suppose a freelancer wants to deliver 48 approved visuals. They prepare twelve test images: small and large dimensions, light and dark backgrounds, fine details, and text. They set the output format and check that their tool supports the intended GPU. The number of images is a project assumption, not an announced production rate.

They start with one image, then a small batch. If the large inputs fail, they first reduce how many are processed together and check what a single image needs. If that single image still exceeds memory at acceptable quality, they look at the next tier up. If memory is sufficient but the result disappoints, they revisit the method before changing cards.

The budget file provides an illustrative 3-day schedule on an RTX A5000 lot at 23.57 USD. Assuming 48 accepted results, the package works out to about 0.49 USD per result. This calculation is reproducible from the price and the assumption; it does not prove that this output will be produced in three days. The budget guide breaks down the line items and offers the sheet to edit.

Compare two options with the same work

Keep the files, versions, settings and quality criterion identical. Note separately the preparation, the first launch, the subsequent runs and the retrieval. Also keep the errors and the retries. An option does not improve your project if the apparent gain comes from a less demanding setting that makes the output unusable.

Your summary can fit in a few lines: configuration, test success, observed time, observed memory and remarks. Without a comparable run, describe what you want to test rather than ranking the models. A price, a generation or a vendor score does not represent your full workflow.

Choose the period, then prepare the order

Count the preparation against the rental, the active work, the waiting, the retries and the export. Preparation finished earlier on your own computer stays outside this window. Then compare 3, 7 and 30 days with the number of lots retained. If the window exceeds 30 days, none of these packages covers it alone; the calculation does not assume an extension.

Keep an explainable decision: compatible model, capacity retained, test to run, package total and files to save. In the configurator, enter the preparation you want and create your account or log in. The payment flow then explains the network, the exact amount and the tracking after "I've paid". The schedule describes the work after it's made available; it is not an estimate of the delivery time.

On to the next step

The reads useful for this project

The whole library

Frequently asked questions

Is 24 GB enough for a first GPU rental?

It depends on the software, the inputs and the settings, not on the fact that it's your first rental. A 24 GB card is an option when the work fits within that capacity and the software chain supports it. Check a representative case, including the most demanding inputs, before concluding that the whole project will fit.

Why won't a 48 GB card necessarily be faster?

Memory capacity indicates the space available for the computation's elements; it does not by itself describe the speed of your application. Moving to 48 GB can mainly allow you to handle work that did not fit before. To compare durations, use the same files and settings, with an output of acceptable quality.

Can two 24 GB GPUs replace a 48 GB GPU?

Not automatically. Each GPU keeps its own memory and the software must know how to distribute the work. An application limited to a single GPU does not gain a single 48 GB of memory because a second card is present. Check the tool's multi-card method before increasing the number of lots.

Does choosing the PyTorch preparation mean my project is ready to start?

No. This choice indicates the preparation you want for the order, without certifying an installed version or the compatibility of your extensions. Note your project's prerequisites, then check the environment actually provided with a small run. A recognized application and a checked output provide more useful information than the name of the preparation alone.

Does one successful small test let you launch the whole project right away?

It only validates the scope you tested. Add the difficult cases, then gradually increase the batch size if the software allows it. Check the memory requirement and the outputs at each step. A small image or a short request does not necessarily represent the most demanding case in the project.

Does the budget tool choose the GPU for me?

No. It calculates the price of the plans for the model you chose and compares their duration with your working window. The results depend on your assumptions about schedule, quantity, and accepted results. The tool does not test your software, does not measure GPU throughput, and does not determine the time until the machine becomes available.

Go at your own pace

A little method goes a long way at the start.

Open the guides